Sightings 08.15.09 / Taylor Yard |
+ Larger Font | + Smaller Font August 15, 2009 The yard is empty, with just a caboose ... Until a southbound comes through and stops at the Yard Office.
Traffic is still very light and the yard is almost always empty as the Economy still sputters ... |
|
Built with RailBlogger V2.5 My homemade php program to build pages. |
Tidbit :
From 1981 CONRAIL Timetable :
WILKES-BARRE SECONDARY TRACK
(Lehigh Division)
3.9 CENTRAL SCRAP IRON 1
2.5 FRANKLIN CROSSING 1
1.3 ASHLEY 1
174.0 FRANKLIN JCT (Connction to
Franklin Ind Track
171.6 SOUTH WILKES-BARRE
175.9 DANA ST. WILKES-BARRE
176.0 WILKES-BARRE
177.2 NORTH WILKES-BARRE
178.3 SHAFER 2
180.3 PLAINSVILLE
185.5 PITTSTON JCT (Connection to Lehigh
Main Line - Connection to
Taylor Secondary Track) 2
The direction from Central Scrap Iron to
Pittston Jct is westward.
Track Controlled by Train Dispatcher,
Bethlehem
Note 1 - Distance From Franklin Junction
Note 2 - Westward Trains must not pass Shafer
or Pittston Lumber Switch MP 185.0 without
authority of Train Dispatcher, Bethlehem
(At this point in time, the Lehigh Line has not
been downgraded to Secondary line status)
|