Sightings 07.11.09 / CP at Hudson

 

+ Larger Font | + Smaller Font

July 11, 2009

Four-Axle Units Thru Hudson

2 of the older four-axle units haul a train Northbound thru the site of the former Hudson Yard.


Sightings 07.11.09  / CP at Hudson


Sightings 07.11.09  / CP at Hudson


Sightings 07.11.09  / CP at Hudson






Home   Section

 Built with RailBlogger V2.5

        My homemade php program to build pages.

Tidbit :


From 1981 CONRAIL Timetable :

WILKES-BARRE SECONDARY TRACK
      (Lehigh Division)

3.9    CENTRAL SCRAP IRON  1    
2.5    FRANKLIN CROSSING   1
1.3    ASHLEY              1
174.0  FRANKLIN JCT (Connction to 
       Franklin Ind Track
	   
171.6  SOUTH WILKES-BARRE
175.9  DANA ST. WILKES-BARRE
176.0  WILKES-BARRE
177.2  NORTH WILKES-BARRE
178.3  SHAFER  2
180.3  PLAINSVILLE
185.5  PITTSTON JCT (Connection to Lehigh 
       Main Line - Connection to
	   Taylor Secondary Track) 2
 
The direction from Central Scrap Iron to 
Pittston Jct is westward.
Track Controlled by Train Dispatcher,
Bethlehem 


Note 1 - Distance From Franklin Junction 
Note 2 - Westward Trains must not pass Shafer 
or Pittston Lumber Switch MP 185.0 without 
authority of Train Dispatcher, Bethlehem

(At this point in time, the Lehigh Line has not
been downgraded to Secondary line status)