Sightings 05.09.09 / Southbound Stack Train At Taylor

 

+ Larger Font | + Smaller Font

May 9, 2009

Stack Train At Taylor

A southbound stack train moves through Taylor Yard on a warm, Spring evening. Stacks and containers follow 2 newer units.


Sightings 05.09.09 / Southbound Stack Train At Taylor


Sightings 05.09.09 / Southbound Stack Train At Taylor


Sightings 05.09.09 / Southbound Stack Train At Taylor


Sightings 05.09.09 / Southbound Stack Train At Taylor





There has been a slight upswing in Rail Traffic. Almost nothing was running over the winter. Now there are more trains in both night and day.


Home   Section

 Built with RailBlogger V2.5

        My homemade php program to build pages.

Tidbit :


In the DL&W Scranton Station, 
now the Radisson,there are about
20 ceramic tile work mosaics around 
the main concourse of the building. 
The tile work pictures were supposed to
represent locations on the railroad.