DL On Bridge 60 |
+ Larger Font | + Smaller Font March 29, 2013 It was Good Friday. I went in to visit the Grave at St. Vladimers. Came out and the DL was crossing Bridge 60.
|
|
Built with RailBlogger V2.5 My homemade php program to build pages. |
Tidbit :
From 1981 CONRAIL Timetable :
WILKES-BARRE SECONDARY TRACK
(Lehigh Division)
3.9 CENTRAL SCRAP IRON 1
2.5 FRANKLIN CROSSING 1
1.3 ASHLEY 1
174.0 FRANKLIN JCT (Connction to
Franklin Ind Track
171.6 SOUTH WILKES-BARRE
175.9 DANA ST. WILKES-BARRE
176.0 WILKES-BARRE
177.2 NORTH WILKES-BARRE
178.3 SHAFER 2
180.3 PLAINSVILLE
185.5 PITTSTON JCT (Connection to Lehigh
Main Line - Connection to
Taylor Secondary Track) 2
The direction from Central Scrap Iron to
Pittston Jct is westward.
Track Controlled by Train Dispatcher,
Bethlehem
Note 1 - Distance From Franklin Junction
Note 2 - Westward Trains must not pass Shafer
or Pittston Lumber Switch MP 185.0 without
authority of Train Dispatcher, Bethlehem
(At this point in time, the Lehigh Line has not
been downgraded to Secondary line status)
|